More repaving coming

The City has awarded another contract for repaving Surrey’s roads. This is in addition to two other contracts signed last month. The sections of roadwork include:

  • 152 St between 88 Ave and 56 Ave
  • 64 Ave between 148 St and 146 St
  • 64 Ave between 156 St and 152 St
  • Fraser Highway between 148 St and 140 St
  • 192 St between 92 Ave and 90 Ave
  • 88 Ave between Harvie Road and 192 St
  • 80 Ave between Harvie Road and 184 St

Blog Widget by LinkWithin
This entry was posted in Cloverdale, Fleetwood, Guildford, Newton, Transport and tagged , , , , , . Bookmark the permalink.

Comments are closed.