Fresh pavement coming soon [pics]

The City has awarded two contracts for patching and repaving a number of sections in the road network, including:

  • 104 Ave between 152 St and 160 St
  • 152 St between 64 Ave and 88 Ave
  • King George Highway between 108 Ave and the Pattullo Bridge
  • 132 St between 72 Ave and 82 Ave
  • 140 St between 72 Ave and 80 Ave
  • 60 Ave between 177B St and 192 St

The full list can be viewed at the links above. Maps are included below.

Blog Widget by LinkWithin
This entry was posted in Development, Transport and tagged , , , , , , , , . Bookmark the permalink.

One Response to Fresh pavement coming soon [pics]

  1. Pingback: More repaving coming | Civic Surrey